Project Details
HongKong
Civil Engineering and Development Department
Second Round Engineer Inspections and Upgrading Works for WSD Slopes 2002 – 2003 Programme – Design and Construction, CE 77/2001 (GE)
Made used of the digital photogrammetric system to model spatial and temporal variations of man-made slope features. By generating DEMs of pre and post period of the site to measure the topographic and volumetric changes of the target study area